Development of simulation-base tool for:
• comparison of plant configuration options,
• evaluation of production plan feasibility with existing or prospective production facilities,
• determining key equipment units that need to be modernized first.
Industry sector: Manufacturing
Client: United Rocket and Space Corporation (URSC)